Hotel in CJ: Societies' objections

1 min read

[From Cyril Richert: We publish below the objections sent by the Battersea Society (download letter here) and the Wandsworth Society (download letter here).]
Author: Battersea Society

15 June 2009
The Battersea Society acknowledges that hotel accommodation is a desirable use in Battersea Town Centre, and potentially on this site, but wishes to object to the scale and height of this proposed building.
We consider a 16-storey building would be entirely out of place on a site which is so significant in relation to the Clapham Junction Conservation Area and the listed buildings it contains.
We note two specific points in relation to the present proposal:

  1. It does not appear that the plans have been developed in consultation with an operator for a hotel once built. We suggest that an operating plan ought to have been developed as a basis for decisions regarding number and size of rooms required for economic viability and the grade of hotel accommodation appropriate for this site.
  2. The height of the proposed tower is the result of using only part of the site for the bedroom block, and alternative approaches coudl have been adopted.

We urge the council to reject the present proposal.


Author: Wandsworth Society

8 June 2009
We have been provided with drawings of the proposal and would wish to raise objection on the following grounds:
We believe that the height and general massing is excessive in this location, although we accept that the proposed use would be suitable, being close to the transport interchange and shopping facilities.
The height of sixteen floors would be completely out of character with the conservation area and would dominate the adjoining low-rise Victorian houses in Mossbury Road whose residents would suffer from a substantially increased noise level with deliveries at all time of the day and night.
Service traffic will be considerable for a hotel of 132 rooms, including a conference centre and could cause serious problems for this already very busy road junction. There will also be greatly increased pressure on residents’ parking space, as no on-site parking, or dropping-off spaces for guests is provided and outside business hours parking will be difficultor impossible to control. There are no off-street public parking areas in the immediate vicinity. we understand the nearby supermarkets are adamant that their car parks are for shoppers only.
In the absence of a comprehensive plan for the area, we believe that the proposal will set a precedence for buildings of similar height and mass that is unacceptable.
We trust that you will take these objections into account in your consideration and report to the Committee and recommend refusal for the application.

Do you think what we are doing is helping the community and you want to encourage us to do more?

Your help means we can spend more time researching stories, talking to contacts, sitting through meetings and writing stories. Any money given will support community and public interest news and the expansion of our coverage in area of Clapham Junction. Battersea, Wandsworth and around.

Support us, help us to expand: subscribe to CJI with a monthly donation

Donate

Monthly amount needed to make it sustainable:

We'd be interested to hear what kind of articles you would like to see more of on the site – send your suggestions to the editor.

CJI editor and Clapham Junction Action Group co-founder and coordinator since 2008, Cyril has lived in Clapham Junction since 2001.
He is also funder and CEO of Habilis-Digital Ltd, a digital agency creating and managing websites and Internet solutions.